Projects: In Progress & Complete

Just Completed: John Adams Middle School Performing Arts Center (JAMS)

Just Completed: John Adams Middle School Performing Arts Center (JAMS)

This performing arts center located in Santa Monica will be a joint use for both JAMS and Santa Monica College. This state-of-the-art performance center boasts a 750-seat amphitheater lined with specialized Acoustic panels and sound integration via Meyer Sound electronic acoustic system providing the clearest sound by onstage performers. Elite provided and installed a massive…
Recently Completed: Westin Anaheim Resort

Recently Completed: Westin Anaheim Resort

A Four-Diamond hotel located at the center of the Anaheim resort district. This prime location is minutes from famous and popular destinations such as Disneyland, Honda Center, Los Angeles Angels of Anaheim stadium, coastal beaches and many iconic attractions Southern California is known for. This resort is equipped with 618…
Recently Completed: Venice High School

Recently Completed: Venice High School

The oldest high school in LA County, LAUSD has opted to reinvest in their educational facilities by adding 5 new buildings to revitalize this historic school…
Recently Completed: 8899 Beverly Condominiums

Recently Completed: 8899 Beverly Condominiums

8899 Beverly are high-profile condominiums located in the Arts and Design District of West Hollywood. Complete with many amenities such as fitness center, yoga studio, parking stables, on-site Madeo Ristorante, a 12,000 square-foot outdoor common area, an 11-meter outdoor pool with surrounding gardens, and landscaping providing privacy for residents. The project utilizes the first TI Beam system on the West Coast, and all the glass used on the project was manufactured and shipped from Tivitec Glass out of Spain, including 23’ tall insulated glass units located in the South Tower. When entering the 9th floor Penthouse, visitors find a full, 360-degree glass guardrail, codesigned and implemented by Elite.
Completed: Yale Transitional Center

Completed: Yale Transitional Center

This center was built to replace the Courtyard Shelter, formerly a bus terminal in Downtown Santa Ana and retrofitted to help those in need. Yale Transitional Center is designed to be a huge improvement in…
Completed: Cedars-Sanai Medical Center

Completed: Cedars-Sanai Medical Center

The new, three-story Breast Center at Cedars-Sanai Medical Center in Beverly Hills, CA, sought to create an enhanced space for patient registration, exams, support, and healing. Elegant and innovative work from Elite provided an inviting, calming, and professional space for both patients and healthcare providers, for collaboration spaces, ultrasound, mammography, stereotactic, and exam rooms.
Completed: Marriott Edition Hotel & Residences

Completed: Marriott Edition Hotel & Residences

Located at the highly visible corner of Sunset Boulevard and North Doheny Drive where Beverly Hills meets West Hollywood, the Marriott Edition Hotel & Residences consists of two towers, one 10 stories and the other 14 stories.  The high design project by renowned designer Ian Schrager features 190 guest rooms and 48 suites with 2 penthouses. The hotel also features 20 luxury residences and over 6,500 square feet of meeting and event space. The hotel boasts inspiring and sophisticated outlets which include a signature restaurant, lobby lounge, basement club and expansive rooftop pools. Elite’s scope included all exterior curtain wall and storefront features as well as...
Completed: NOHO West

Completed: NOHO West

NOHO West is an expansive retail and entertainment center in the heart of North Hollywood. The 17.25-acre Commercial/Retail project previously housed the Laurel Plaza Mall before the 1994 Northridge earthquake.  Prominent features of Elite’s scope on this project include a 60 foot tall curtain wall at the ellipse rotunda and a segmented second story guardrail.  Project also included three multi-colored, structurally glazed or SSG curtain walls as well as...
Completed: Castaic High School

Completed: Castaic High School

This $100 million project was for the construction of the new Castaic High School, consisting of twelve new buildings totaling 256,230 SF on a 58 acre campus. New buildings include five classroom buildings, an administration building, a science classroom and library building, a gymnasium building with locker rooms and training spaces, a performing arts building, a full-service food service building, and a maintenance building. Elite Glazing Group was the sole glass and glazing company on this project which spanned approximately 18 months.  General scope included exterior storefront and curtain wall applications, extensive...
Completed: City National Plaza Building

Completed: City National Plaza Building

The City National Plaza project consisted of renovation of existing lobbies during full occupancy of both towers and a new indoor / outdoor Event Center amenity for the Plaza in the North Tower. Lobby Renovations included security system upgrades, installation of new exterior bi-fold glazing partitions, new lighting including feature fixtures, installation of a new ceiling, lobby benches, barrisol ceilings at elevator lobbies and new custom reception / security desks.  Event Center work included extensive demolition of existing offices and finishes, new bathroom, kitchen, and bar facilities, new lighting and audio visual interior and exterior, exterior water and fire features, multi-level patio area with trellis and planter areas. Elite’s scope included the ground floor lobby exterior and interior renovation. The project consists of a complete renovation of...
Completed: Kaiser La Habra MOB

Completed: Kaiser La Habra MOB

Kaiser Permanente opened the La Habra Medical Office Building (MOB) in late 2017. The La Habra MOB is one of Kaiser’s first “RAD” (Re-Imagined Ambulatory Design) facilities, which aims to re-think and add a more personal touch to patient care in the MOB environment. The 28,000-square-foot structure is targeting LEED Platinum certification. The project is a two-story medical office building with Viewglass dynamic glazing integrated into the storefront system and automatic entrances.  The design feature includes a segmented radius storefront with...
Completed: Kaiser Bellflower MOB Behavioral Health Skin Upgrade

Completed: Kaiser Bellflower MOB Behavioral Health Skin Upgrade

The key aspect of this project was a remodel to enclose the exterior walkways on the main tower of the facility. Elite’s scope included the retrofit of the existing exterior skin with a curtainwall system including formed aluminum panels transitioning around Trespa panels to...
Completed: Henry Mayo Newhall Hospital

Completed: Henry Mayo Newhall Hospital

Located in Valencia, CA., the new tower of the Henry Mayo Newhall Hospital project consists of a new six story patient tower.  The 160,000 square foot facility provides 130 additional patient beds to the hospital’s campus in Valencia and two new surgery suites in the Center for Women and Newborns. This OSHPD project consisted of significant curtain wall applications and oversized storefronts in punched openings.  The project had a substantial amount of fire rated glass throughout as well as all-glass...
Completed: Los Angeles Harbor College SAILS Student Union Building

Completed: Los Angeles Harbor College SAILS Student Union Building

Design and construction of a new Student Union Building to contain approximately 58,000 gross square feet on 2-levels is included as a S.A.I.L.S. project. Elite’s scope included multiple integrated curtain wall systems which were designed by Elite and were required to meet stringent LACCD seismic criteria.  The project included exterior and interior storefront systems as well as many skylights and 4’ diameter solar tubes.  Also prominent are oversized bi-fold doors and a large interior system throughout including auto doors and transaction windows.  The project also present complex waterproofing applications given the various skin elements of the building.

Completed: Monsignor Oscar Romero Charter Middle School

The Monsignor Oscar Romero Charter Middle School project involved the construction of a new 49,000 SF charter middle school, including a 3,608 SF one-story administration building, a 28,906 SF two-story classroom building, a 4,817 SF one-story multi-purpose building, and 18,000 SF of underground parking.  Elite’s scope consisted of classroom windows with operable egress single hung windows with security screens, bifold...